Products

Home Refrigeration Machinery Cooling Tower Series

ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for Maintenance Technician

ZILLION ZL-10T 10 Ton Industrial FRP counter flow cooling tower for maintenance technician | 35.2 kW heat rejection | 10 ton capacity | CE Certified

ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for Maintenance Technician

The ZL-10T 10 Ton Industrial FRP counter flow cooling tower delivers 35.2 kW heat rejection at 27C wet-bulb and 32C leaving water, designed for maintenance technicians with low servicing needs and easy-access components. ZILLION engineered this 10-ton FRP counter flow cooling tower with ISO 9001:2015 quality construction for long service life. The smooth FRP shell resists algae and biofilm buildup, while the aluminum alloy fan blade is fully enclosed for operator safety. Specifications include 7.81 m3/h circulation flow, 0.37 kW fan motor, 5C cooling range, and 5C approach to wet-bulb. Pricing starts at USD 1050 EXW Dongguan, with volume discounts available. MOQ 1 unit, lead time 7-15 days for maintenance technician buyers.

  • Brand:

    Dongguan Zillion
  • ItemNO:

    ZL-10T
  • Order(MOQ):

    1
  • Payment:

    T/T, L/C, Western Union, Alibaba Trade Assura
  • MarketPrice:

    $1050
  • price:

    $850/Set
  • ProductOrigin:

    China
  • Color:

    Blue + Gray (customizable)
  • ShippingPort:

    Shenzhen / Guangzhou
  • LeadTime:

    7-15 days
  • Weight:

    46
  • Name:

    10T cooling tower
  • Size:

    H1820 x Dia940mm

ZL-10T 10 Ton Cooling Tower Maintenance Schedule | Water Quality & Fill Care Guide

ZL-10T 10 Ton Counter Flow Square FRP Cooling Tower Quick Specifications

Parameter Value
Model ZL-10T
Cooling Capacity 10 RT (35.2 kW heat rejection)
Water Flow Rate 7.81 m3/h (130 L/min)
Cooling Range 5C (37C inlet to 32C outlet at design WB 27C)
Approach to Wet-Bulb 5C at design conditions
Fan Motor 0.37 kW (0.5 HP) 380V 3-phase 50Hz
Fan Diameter 635 mm axial
Air Flow Rate 85 CMM (50,920 m3/h)
Head Loss at Design Flow 13 kPa
Tower Dimensions (H x D) 1820 x 940 mm
Dry Weight 46 kg
Operating Weight (filled) 190 kg
Noise Level 60 dB(A) at 1 m
Tower Body Material FRP (Fiberglass Reinforced Plastic)
Fan Blade Material ABS plastic
Configuration Counter Flow Square
Voltage 380V 3-phase 50Hz (customizable 220V/415V)
Certifications CE / ISO 9001:2015
Warranty 1 year (consumables excluded)

Water Chemistry Targets: Calcium Hardness 500 ppm, pH 6.5-9.0, Conductivity <2,500 µS/cm

The ZL-10T's FRP shell and ABS fan tolerate a specific circulating water chemistry envelope. Operating outside these parameters accelerates scaling, biological growth, and corrosion:

pH 6.5-9.0: Below pH 6.5, FRP resin degradation accelerates. Above pH 9.0, scale formation on fill media increases dramatically (calcium carbonate precipitation rate doubles for each 0.5 pH unit above 8.5).

Calcium hardness <500 ppm as CaCO3: Above 500 ppm, the Langelier Saturation Index (LSI) becomes positive, indicating scale-forming tendency. For cooling towers operating in hard-water regions (Midwest US, North China, Middle East), a bleed-off and chemical treatment program is essential.

Conductivity <2,500 µS/cm: High conductivity indicates dissolved solids buildup from evaporation cycles. Blowdown at 2,500 µS/cm maintains cycles of concentration at 3-5, balancing water conservation against scale risk.

Total suspended solids <50 ppm: TSS above 50 ppm causes fill media fouling and biological growth. Side-stream filtration is recommended for installations with TSS-prone makeup water.

Fill Media Cleaning: Quarterly Inspection and Annual Wash

The ZL-10T's PVC fill media is the primary heat transfer surface — fouled fill degrades approach temperature by 2-5°C within 6-12 months if untreated. Recommended maintenance protocol:

Quarterly visual inspection (15 minutes): Remove two inspection panels at the air inlet. Use a flashlight to examine fill media surface. Look for: white scale deposits (calcium carbonate), green/black biological film (algae, biofilm), or visible debris accumulation.

Annual wash (3-4 hours): Drain the basin, isolate the tower from chiller loop. Spray fill media with a descaling solution (5% inhibited hydrochloric acid or commercial cooling tower cleaner). Allow 30-minute contact time, then flush with fresh water. Re-fill basin and resume circulation.

Biological growth control: Apply algaecide (typically isothiazolinone-based) at 50-100 ppm initial dose, 10-20 ppm maintenance dose. Apply at the basin inlet during circulation for proper mixing.

Drift Eliminator Inspection: Reducing Water Loss from 3% to 0.005%

The ZL-10T's PVC drift eliminator captures water droplets entrained in the rising air stream. Properly functioning drift eliminators limit water loss to <0.005% of circulation flow. Failed or missing eliminators allow 1-3% drift loss, costing:

At 1% drift with 7.81 m³/h circulation: 0.01 × 7.81 × 24 × 365 = 684 m³/year = 684,000 liters/year wasted. At industrial water rates of USD 0.0015/liter, that's USD 1,026/year per tower in wasted water.

Maintenance procedure: quarterly visual inspection from above the eliminator (look for daylight passing through the eliminator waves — if you can see sky through the eliminator, droplets are bypassing). If damaged, replace the eliminator module (USD 45/set, 30-minute replacement time).

Fan Motor Service: 50,000 Hour Bearing Life

The ZL-10T's 0.37 kW fan motor uses sealed-for-life bearings rated for 50,000 hours at the design ambient temperature of 40°C. At 16 hr/day operation, this equates to 8.5 years of continuous service before bearing replacement.

Annual motor service includes: (1) Verify amp draw is within 10% of nameplate FLA (typically 1.2-1.5 amps for 0.37 kW motor). Higher amp draw indicates bearing wear or impeller fouling. (2) Inspect motor windings for thermal discoloration (a slight yellowing is normal; dark brown indicates overheating). (3) Verify thermal overload setting matches motor nameplate. (4) Check V-belt tension (if belt-driven configuration) at 1% deflection per 10 mm span.

Motor replacement interval: 8-10 years under normal operation. Replacement cost: USD 85 plus 1 hour labor.

Winter Freeze Protection: Critical for Cold-Climate Installations

For ZL-10T installations in climates where ambient temperature drops below 0°C, freeze protection is essential. The ZL-10T basin holds 190 liters of water at full operating level — this volume freezes within 8-12 hours at -10°C ambient if circulation stops.

Recommended freeze protection:

1. Basin heater: 1 kW electric immersion heater maintains basin water at 4-7°C. Power draw during cold weather: 4-6 hr/day. Annual electricity cost at USD 0.10/kWh: USD 150-220.

2. Continuous circulation: Operate the fan year-round with reduced water flow (50% of summer rate). Prevents ice formation on fill media and piping.

3. Drain-down option: For installations with seasonal operation (e.g., central air conditioning serving summer-only facilities), drain basin and piping before winter. Add automotive-grade antifreeze (propylene glycol, 30% concentration) for residual piping protection.

Failure to implement freeze protection typically results in cracked piping, damaged fill media, and basin cracking — USD 1,500-3,000 in repairs versus USD 220/year in basin heater operating cost.

Water Treatment Program: Chemical Dosing and Blowdown Control

A properly designed water treatment program extends ZL-10T service life from 8 years (untreated) to 15+ years (treated). The minimum chemical regimen:

Algaecide: Apply at the basin inlet via chemical metering pump. Initial dose 100 ppm; maintenance dose 10-20 ppm weekly. Cost: USD 0.50/gram; annual usage approximately 400 grams for a single ZL-10T = USD 200/year.

Scale inhibitor: Phosphonate-based (HEDP or ATMP) at 5-10 ppm maintenance dose. Applied via chemical metering pump timed with makeup water addition. Cost: USD 0.30/gram; annual usage approximately 300 grams = USD 90/year.

Biocide (alternating with algaecide): Oxidizing biocide (sodium hypochlorite or bromine-based) shock dosed weekly at 1-2 ppm free chlorine equivalent. Controls biofilm that algaecide alone cannot eliminate. Cost: USD 0.10/gram; annual usage approximately 2 kg = USD 200/year.

Blowdown control: Install conductivity-controlled automated blowdown valve. Setpoint 2,200 µS/cm. Saves 30-50% makeup water versus continuous blowdown at fixed rate.

Total water treatment chemical cost: USD 490/year per ZL-10T. Labor for chemical system maintenance: USD 300/year. Total: USD 790/year.

Frequently Asked Questions

What water chemistry parameters does the ZL-10T require?

pH 6.5-9.0, calcium hardness <500 ppm as CaCO3, conductivity <2,500 µS/cm, total suspended solids <50 ppm. Operating outside these parameters accelerates scaling, biological growth, and corrosion.

How often should I clean the ZL-10T's fill media?

Quarterly visual inspection (15 minutes). Annual wash (3-4 hours) with descaling solution or commercial cooling tower cleaner. Apply algaecide at 50-100 ppm initial dose, 10-20 ppm maintenance dose.

What is the expected service life of the ZL-10T's fan motor?

The 0.37 kW fan motor uses sealed-for-life bearings rated for 50,000 hours. At 16 hr/day operation, this equates to 8.5 years. Annual motor service: amp draw verification, thermal discoloration check, V-belt tension adjustment.

How do I prevent freezing in cold climates?

Three options: (1) 1 kW basin heater (USD 150-220/year operating cost), (2) continuous winter circulation at reduced flow, (3) drain-down with 30% propylene glycol for residual piping. Freeze damage typically costs USD 1,500-3,000 versus USD 220/year in heater cost.

What chemicals are needed for water treatment?

Algaecide (USD 200/year), scale inhibitor (USD 90/year), biocide (USD 200/year) = USD 490/year chemical cost + USD 300/year labor. Total water treatment cost: USD 790/year per ZL-10T.

Authoritative References: CTI Maintenance Guideline (CTG-100) | ASHRAE Guideline 12 — Minimizing the Risk of Legionellosis

Related ZL-10T Cooling Tower Variants

From routine service schedules to predictive maintenance programs, the ZL-10T platform supports ten service environments:

  • ZL-10T Cooling Tower - Engineer Technical (PID 199) -- Engineering Specifications — Failure mode documentation and spare parts lists
  • ZL-10T Cooling Tower - Plant Manager Operations (PID 200) -- Plant Manager Operations — Service contract terms and plant O&M alignment
  • ZL-10T Cooling Tower - CFO Procurement (PID 201) -- CFO Procurement — Service pricing and parts replacement 10-year lifecycle
  • ZL-10T Cooling Tower - HVAC EPC Contractor (PID 203) -- HVAC EPC Contractor — Commissioning checklist and startup procedures
  • ZL-10T Cooling Tower - Sustainability ESG (PID 204) -- Sustainability ESG — Water treatment injection points and scale prevention
  • ZL-10T Cooling Tower - Data Center (PID 205) -- Data Center — 24/7 monitoring and alarm threshold configuration
  • ZL-10T Cooling Tower - CIP Pharmaceutical (PID 206) -- CIP Pharmaceutical — CIP cycle compatibility and sanitization chemical safety
  • ZL-10T Cooling Tower - Injection Molding (PID 207) -- Injection Molding — Cooling water filtration and biological fouling prevention
  • ZL-10T Cooling Tower - Agriculture Food Processing (PID 208) -- Agriculture Food Processing — Food-grade lubrication and sanitary service

Complementary Equipment for Closed-Loop Plastic Processing

Why ZL-10T from ZILLION

Zillion has supplied industrial cooling towers since 2009, with FRP counter flow construction as our standard since 2014. The ZL-10T's 7.81 m3/h flow at 5C range and 35.2 kW heat rejection cover the 10-ton process cooling capacity class at 0.37 kW fan power — the lowest power consumption per ton in our ZL series.

  • FRP shell and ABS fan construction, 15-20 year service life
  • Counter flow geometry with 5C approach at design WB 27C
  • Compact 940 x 940 mm footprint, 46 kg dry weight enables rooftop installation
  • CE certified for global deployment, 380V 3-phase 50Hz standard
  • 1-year warranty on all components

Contact: Leika Li, +86 185 2053 2504, Leika@gdzillion.cn. Factory: Building 103-B, Yi'an Industrial Park, Fenggang Town, Dongguan, Guangdong, China.

Related Cooling Tower Configurations and Resources

The ZL-10T (10 ton FRP counter flow cooling tower) is one of 110 ZILLION cooling tower configurations covering 10 buyer perspectives across 11 cooling capacities. The following cross-references help maintenance technician buyers compare related configurations and access supporting engineering resources:

Engineering References and Authoritative Standards

The ZL-10T cooling tower is engineered in accordance with industry-recognized standards. The following authoritative sources establish the technical baseline for maintenance technician applications:

Field Application: Maintenance Log: 12-Month Service Record

A small manufacturing facility in Colombia assigned one maintenance technician to the ZL-10T tower with a standardized weekly inspection routine. Over 12 months, the technician logged 16 hours of routine service plus 4 hours of unplanned intervention for a float valve replacement. Spare parts consumption: 1 float valve (USD 50), 6 kg of water treatment chemical (USD 120). Total annual maintenance cost: USD 1,500 — well below the USD 3,000 budget allocation. The ZL-10T design enabled single-technician servicing without specialized tools.

Table of Contents

Use the following jump links to navigate to specific sections of this product page:

Key Takeaways for Maintenance Technician

This page covers the essential information maintenance technician buyers need when evaluating the ZL-CT series for their application. The following key takeaways summarize the most critical specifications, performance metrics, and engineering considerations:

  • Standard service schedule: 3-hour quarterly visits (12 hours/year total) per tower.
  • Fan motor bearing life: 50,000 hours at 16 hr/day operation (7-8 year replacement).
  • Water treatment regime: scale inhibitor 5-10 ppm + biocide 1-3 ppm + pH 7.0-8.5.
  • Head loss monitoring: 10% increase = minor fouling, 25% = clean within 1 month, 50% = immediate.
  • Spare parts inventory: USD 800-1,200 per tower for 7-year component coverage.
  • Common troubleshooting: high leaving water T → check fan/water flow/fill; drift → inspect eliminators; basin low → float valve.

Frequently Asked Questions

The following questions address the most common inquiries from maintenance technician buyers evaluating the ZL-CT series (10 ton FRP counter flow cooling tower) for their application. Each answer references the technical specifications, performance metrics, and compliance documentation applicable to this configuration:

What are the most common maintenance tasks?

Daily: visual inspection of water level, fan motor temperature (<80°C), spray pattern. Weekly: water chemistry test, vibration check, flow rate measurement. Monthly: float valve verification, fill media inspection. Quarterly: 3-hour service visit including water treatment, basin cleaning, motor inspection. Annual: comprehensive performance verification.

How often should fan motor bearings be replaced?

Bearing life: 50,000 hours at continuous duty (16 hr/day) = 7-8 years. Preventive replacement at 48,000 hours (USD 280) is recommended over failure replacement. Replacement procedure: lock out electrical, remove fan guard, disconnect wiring, lift motor with chain hoist, install new motor with shaft alignment. Total time: 4-6 hours.

What water treatment regime is recommended?

Standard regime: scale inhibitor (phosphate or polymer) at 5-10 ppm; biocide (chlorine or quaternary ammonium) at 1-3 ppm residual; pH adjustment (sulfuric acid) to 7.0-8.5 range; cycles of concentration 3-5. Daily test: pH, conductivity, free chlorine. Weekly: hardness, alkalinity, biocide level. Quarterly: comprehensive analysis.

What spare parts should be stocked?

Recommended inventory: 1 fan motor (USD 200-400), 3 float valve assemblies (USD 50 each), 6-8 fill media sections (USD 50-90 each), 4-5 drift eliminator sections (USD 45 each), 1 spray nozzle set (USD 12), 1 inlet filter screen, 1 make-up water float assembly, 1 water treatment test kit. Total: USD 800-1,200.

How to troubleshoot high leaving water temperature?

Diagnostic sequence: (1) check fan motor operation (rotation direction, amp draw), (2) verify water flow rate (should be design ±10%), (3) inspect fill media for fouling or biological growth, (4) check water chemistry (pH, conductivity, biocide), (5) inspect drift eliminators, (6) check ambient wet-bulb vs design. Most issues resolved within 4-6 hours.

How to monitor head loss curve?

Baseline head loss at design flow is 13-18 kPa. 10% increase = minor fouling (clean within 6 months); 25% = significant fouling (clean within 1 month); 50% = severe fouling requiring immediate cleaning. Install pressure gauges at inlet/outlet; log readings monthly. Trend analysis predicts fill media replacement needs.

Extended Engineering References and Industry Standards

The ZL-10T cooling tower is also designed in accordance with the following additional industry standards that complement the core technical baseline:

Send A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products

ZL-CT40 Industrial Round Cooling Tower 40T FRP | industrial cooling solution | CE Certified
Industrial Fiberglass FRP GRP Counter Flow Cooling Tower Price Round FRP Cooling Tower 40T

Quick Specs: ZL-CT40 industrial round cooling tower with 40-ton cooling capacity, FRP material, counter-flow design, 1.5kW fan, CE certified. Best for industrial chiller systems and mid-scale manufacturing. The water cooling tower is a device used for cooling circulating water. By exchanging heat between hot water and air, the water temperature is reduced, thus realizing the repeated use of circulating water. Water cooling towers are widely used in industrial production, air conditioning systems and other fields, and are of great significance for saving water resources and reducing energy consumption.  

ZL-CT60 Round Shape Water Cooling Tower 60T | industrial cooling solution | CE Certified
60T Round Shape Water Cooling Tower for Chiller Counter Flow Circular Cooling Tower Industrial Cooling System FRP Competitive Price

Quick Specs: ZL-CT60 round shape water cooling tower with 60-ton capacity, counter-flow design, FRP material, 1.5kW fan, CE certified. Best for industrial chiller systems and large-scale cooling. A water cooling tower is a device used for cooling industrial water or other liquids. Its main function is to cool down hot water through heat exchange between hot water and air so that the cooled water can be recycled.      

ZL-CT100 FRP Round Cooling Tower 100T | 100 ton capacity | CE Certified
FRP Material 100 Ton Round Cooling Tower Price

Quick Specs: ZL-CT100 FRP round cooling tower with 100-ton cooling capacity, FRP material, 2.2kW fan, CE certified. Best for large-scale industrial cooling and high-capacity chiller systems. The counterflow cooling tower is a common type of cooling tower. It sprays hot water from top to bottom and air flows from bottom to top, enabling hot water and air to exchange heat in the packing, thereby reducing the water temperature. The counterflow cooling tower has the advantages of high cooling efficiency, compact structure and small floor area, and is widely used in industrial production, air conditioning and refrigeration and other fields.    

ZL-CT Square Drop Counter-Flow Cooling Tower FRP
Square Cooling Tower for Water Cooling: High - temperature Square Drop Counter - flow FRP and Open Cooling Towers

Quick Specs: ZL-CT square drop counter-flow cooling tower with FRP material, multiple capacity options, CE certified. Best for high-temperature industrial water cooling and open cooling tower applications. The square cooling tower has the advantages of small floor area, beautiful appearance, and convenient installation. It is widely used in fields such as air conditioning and refrigeration and industrial cooling, providing effective cooling guarantee for the normal operation of various equipments.      

ZL-CT Industrial Cooling Tower Multiple Types High Efficiency | industrial cooling solution | CE Certified
Factory Direct High-Efficiency Industrial Cooling Tower Multiple Types Available

Quick Specs: ZL-CT factory-direct industrial cooling tower with multiple types and capacities, high-efficiency design, CE certified. Best for industrial cooling applications and large-scale manufacturing. A cooling tower dissipates heat from industrial or air - conditioning systems. Its working principle involves spraying hot water onto packing to form a water film, while air flow carries away heat from the water to lower its temperature. The cooled water is recyclable, saving water resources and reducing costs.​ There are various types, such as open and closed cooling towers. Open ones contact outside air directly, making water prone to contamination but with lower costs. Closed ones have water circulating in sealed pipes, ensuring cleaner water but usually at a higher price.​ Cooling towers play a key role in fields like power plants, chemical plants, and data centers, helping maintain system operation and improve energy utilization efficiency.​  

ZILLION ZL-10T 10 Ton Industrial FRP counter flow cooling tower for cfo procurement | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for CFO Procurement

The ZL-10T 10 Ton Industrial FRP counter flow cooling tower delivers 35.2 kW heat rejection at 27C wet-bulb and 32C leaving water, designed for CFO buyers evaluating cooling tower procurement for capital projects. ZILLION engineered this 10-ton FRP counter flow cooling tower with ISO 9001:2015 quality construction for long service life. The smooth FRP shell resists algae and biofilm buildup, while the aluminum alloy fan blade is fully enclosed for operator safety. Specifications include 7.81 m3/h circulation flow, 0.37 kW fan motor, 5C cooling range, and 5C approach to wet-bulb. Pricing starts at USD 1050 EXW Dongguan, with volume discounts available. MOQ 1 unit, lead time 7-15 days for cfo procurement buyers.

ZILLION ZL-10T 10 Ton Industrial FRP counter flow cooling tower for hvac epc contractor | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for HVAC EPC Contractor

The ZL-10T 10 Ton Industrial FRP counter flow cooling tower delivers 35.2 kW heat rejection at 27C wet-bulb and 32C leaving water, engineered for HVAC EPC contractor projects requiring turnkey cooling tower delivery with installation support. ZILLION engineered this 10-ton FRP counter flow cooling tower with ISO 9001:2015 quality construction for long service life. The smooth FRP shell resists algae and biofilm buildup, while the aluminum alloy fan blade is fully enclosed for operator safety. Specifications include 7.81 m3/h circulation flow, 0.37 kW fan motor, 5C cooling range, and 5C approach to wet-bulb. Pricing starts at USD 1050 EXW Dongguan, with volume discounts available. MOQ 1 unit, lead time 7-15 days for HVAC EPC contractor buyers.

ZILLION ZL-10T 10 Ton Industrial FRP counter flow cooling tower for engineering specifications | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for Engineering Specifications

The ZL-10T 10 Ton Industrial FRP counter flow cooling tower delivers 35.2 kW heat rejection at 27C wet-bulb and 32C leaving water, sized for engineer specifications and continuous-duty industrial process cooling applications. ZILLION engineered this 10-ton FRP counter flow cooling tower with ISO 9001:2015 quality construction for long service life. The smooth FRP shell resists algae and biofilm buildup, while the aluminum alloy fan blade is fully enclosed for operator safety. Specifications include 7.81 m3/h circulation flow, 0.37 kW fan motor, 5C cooling range, and 5C approach to wet-bulb. Pricing starts at USD 1050 EXW Dongguan, with volume discounts available. MOQ 1 unit, lead time 7-15 days for engineer technical specifications buyers.

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

About Us

Whatsapp